With more and more hot weather, it is necessary to do a good job to prevent high temperature when construction in concrete mixing plant, so as to prevent machine failure and staff from heat stroke. (XDM Brand Concrete Mixing Plant HZS180 in Malaysia) The first is the heatstroke prevention work of the ready mixed concrete plant staff: reasonable arrangement of working hours and reduction of la...
1.Dust control The place where dust is easily generated in the concrete batching plant is the feeding port of the mixing floor, material yard and the powder silo.To prevent dust spillage the mixing tower of the selected concrete batching plant should be enclosed type. In the production, in order to further eliminate the dust, active color steel plates are added as dust surface, and the space of th...
1.The non-stabilized soil mixing plant professional prohibits the operation and maintenance of the equipment. The operator must perform his duties with due diligence and strictly follow the operating procedures. If there is a problem, stop the equipment immediately. It is strictly forbidden to work when the equipment with failures and it is strictly forbidden for the operator to leave the job. 2.N...
1.Control room maintenance check The control room is the base of the concrete mixing plant. It is equivalent to the human brain. The control room has electrical components such as IPC, display, console, power cabinet, etc., and the electrical components should be protected from water, dust and vibration. Therefore, entering the control room should first check whether the indoor environment is clea...
Copyright © 2015-2024 Fujian Xinda Machinery Co., Ltd..All Rights Reserved.Powered by dyyseo.com