Maintenance notes for water supply system of concrete mixing plant in winter 2021-12-09 10:53:54

The cold climate and environmental conditions pose a severe challenge to the use of concrete mixing plant equipment. In order to make the mixing plant operate smoothly under bad weather conditions, how should we maintain the water supply system of concrete mixing plant in winter?


Maintenance notes for water supply system of concrete mixing plant in winter:


1. The water pump shall be lubricated regularly as required;


2. When the water pump is out of use for a long time, it is necessary to drain the water in the pipe. If a stop valve is installed, pay special attention to emptying the water at the stop valve;


3. Ensure the normal flow of water in the pipe in winter, and add insulation pipes to prevent freezing;


4.Check the joints of water supply pipes regularly, because water is easy to accumulate at the joints.

Previous Post
Newsletter

Sign up receive company information

Copyright © 2015-2024 Fujian Xinda Machinery Co., Ltd..All Rights Reserved.Powered by dyyseo.com

whatsapp : 008615905062290

Tel : 008615905062290

Email : xd@xdmac.com

contacts Home