Ready Mixed Concrete Batching Plant Belt Deviation Processing Process 2017-05-25 10:40:43

(1)Adjust the tensioning mechanism  

When the belt is running of ready mixed concrete batching plant, if the load and heavy load in the case of the same side of the deviation, indicating the tightness on both sides of the belt is not the same, if the belt left and right deviation and no fixed direction, then the telt is loose, need to adjust the tensioning mechanism.

(2)Adjust the rollers of ready mixed concrete batching plant

If the belt is running at the drum, indicating that the installation of the drum is less level, the drum moves axially, or the end of the drum is at the front end. At this point, should correct the roller level and parallelism and so on.

(3)Adjust the roller support of ready mixed concrete batching plant

If the belt is always biased towards one side at no load, the side roll support should be moved 1-2 cm in the tape running direction or the other side of the roller holder is properly raised.

(4)Clear sticks of ready mixed concrete batching plant

If the roller, the roller on the part of the sticky material, will increase the diameter of the place, resulting in increased tension at the tape, resulting in deviation. Should promptly clean up the adhesive material.

Related reading: Stationary Concrete Batching Plant dry mix concrete batching plant

Previous Post Next Post
Newsletter

Sign up receive company information

Copyright © 2015-2024 Fujian Xinda Machinery Co., Ltd..All Rights Reserved.Powered by dyyseo.com

whatsapp : 008615905062290

Tel : 008615905062290

Email : xd@xdmac.com

contacts Home