What are the requirements of the stabilized soil mixing plant for the required raw materials? Cement stabilized soil can be applied to the base and subbase layers of highways at all levels. When cement stabilized medium-grained soil and coarse-grained soil are used as base layers, the cement dosage should not exceed 6%. If necessary, firstly improve the gradation of aggregates and then stabilize t...
Stabilized soil mixing plant is a mixture of various mixing materials to make stabilized soil. Stabilized soil can be applied to the base and sub-base of all levels of highways. So what should we pay attention to when the stable soil mixing plant is shut down? Let's take a brief look: 1.After shutdown, the materials in the mixer of the stabilized soil mixing plant should be cleaned up in time, and...
1.The non-stabilized soil mixing plant professional prohibits the operation and maintenance of the equipment. The operator must perform his duties with due diligence and strictly follow the operating procedures. If there is a problem, stop the equipment immediately. It is strictly forbidden to work when the equipment with failures and it is strictly forbidden for the operator to leave the job. 2.N...
1.Powder weighing is slow Fault phenomenon: The powder is weighed very slowly, the weighing time is more than 2 minutes and the normal weighing is within 20 seconds. Cause Analysis : The influencing factors are mainly the poor feeding of the horizontal cement silo of the concrete batching plant and the damage of the screw conveyor. The forms of poor weighing of powder materials are as follows : po...
Copyright © 2015-2025 Fujian Xinda Machinery Co., Ltd..All Rights Reserved.Powered by dyyseo.com