1.Ensure concrete mixer & its surroundings environment are clean. 2.Timely to check and clear up the material which stay in the weighing hopper,ensure the sensor return back to zero. 3.Timely to check all lubricating point have enough oil or not. The oil mist device of air system should keep enough oil in it. 4.Check all motors and electrical components weather overheating,abnormal noise,instr...
Since the concrete mixing plants began to develop rapidly in China it has a history of more than 30 years. Today, the mixing plant is very mature either from the production experience or the technical level. But we will find a careful summary, the current new mixing plants is also after several generations of updates to become today's appearance. At the beginning, the concrete mixer plants wa...
1.Concrete mixing plant site should be set up a place which is far way from living concentration area. If the site is nearly to living area, the side which nearly to living area should adopt sound arrester. 2.The cleaning effluent of concrete mixer,concrete truck must not discharge disorderly.Drainage ditch system and wastewater slurry sedimentation pool shall be set in the production area of conc...
Before starting up the sabilized soil mixing plant: please do all checks as bellow: 1. Check whether all bolts are fastened, especially the mixing blade in the twin shaft continuous mixer and the vibrator blade of each hopper. 2.Check whether there is any missing place for the belt roller and whether the rotation position is fully lubricated. Each bearing of the mixer is lubricated once every...
Copyright © 2015-2025 Fujian Xinda Machinery Co., Ltd..All Rights Reserved.Powered by dyyseo.com